Microvaults
Live example Asterfold Systems · Board briefing
Asterfold Systems

Board briefing · Q2 2026

Decision edition · 24 July

Compounding
with control.

The company crossed €4.8m ARR without trading away margin. The next constraint is commercial capacity—not demand.

ARR€4.82m+31% YoY

Prepared for the board

Restricted · Version 4

All entities and figures are fictional

Read the signal

01 · Operating signal

Actuals through June 2026

The quality of growth
improved with its pace.

Expansion, margin, and sales efficiency moved together. That makes selective acceleration supportable; it does not make undisciplined hiring supportable.

ARR€4.82m+31% year on year
Net revenue retention112%+6 pts since Q2 2025
Gross margin78%+4 pts year on year
Burn multiple1.4×−0.7× year on year
ARR bridge · €mNet growth concentrated in expansion

02 · Operating scenario

Choose the pace.
Keep the constraint visible.

Change the plan below. Every output recomputes from the same fictional Q2 baseline.

FY27 exit ARR

€7.4m +€2.58m vs current
Runway19.4 mo
FY27 operating margin−4%
Incremental hires6
Runway floor: 12 months.

RecommendationFund six hires behind quarterly pipeline gates. Preserve the option to stop after the first three.

Model note

Directional planning model, not a forecast. New-hire productivity begins in month four; gross margin remains between 76–79%.

03 · What can break the plan

Ranked by board attention

Three risks.
No disguised surprises.

The plan remains credible only if its stop conditions are as explicit as its upside.

01

High · Commercial

Enterprise pipeline converts two weeks slower than plan.

Gate the second hiring wave on €1.1m qualified pipeline and 18% proposal conversion by 30 September.

Owner · CRO
02

Medium · Product

Implementation load erodes expansion margin.

Standardize the top two integrations before accepting another bespoke enterprise dependency.

Owner · CPO
03

Medium · Concentration

Largest customer reaches 14% of recurring revenue.

Keep renewal work executive-owned while raising the top-ten diversification target.

Owner · CEO

04 · Decisions requested

Approve the base plan.
Keep two gates.

The proposal funds commercial capacity while protecting a nineteen-month runway. Management returns in October with evidence against the gates below.

  1. 01
    Approve

    Six incremental hires across commercial, implementation, and data.

    €690k annualized
  2. 02
    Gate

    Release the second three hires only after pipeline and conversion thresholds clear.

    30 Sep 2026
  3. 03
    Return

    Review enterprise concentration and FY27 cash plan with Q3 actuals.

    23 Oct 2026
Management recommendationApprove

Prepared by Asterfold Systems management.
Every name and figure in this example is fictional.

Return to opening

The artifact behind the example

Create the work with AI.
Deliver the real interaction.

This entire board briefing is ordinary HTML, CSS, and JavaScript—no presentation software and no external runtime. Use the prompt, inspect the safe source, then publish your finished folder through Microvaults.

Reusable AI prompt

Start from the structure—not the invented numbers

Build a board update that behaves like a decision tool.

Replace every fictional value with reviewed, sanitized inputs before sharing. Never put secrets or confidential source material into a model you are not authorized to use.

Open prompt file